Construction Operations · KSA · Asia/Riyadh

Operations dashboard

Premium construction safety operations for board-level visibility: site risk, field evidence, corrective actions, and audit readiness.

Sites
1
1 active
Cameras
1/3
Online / total
Open live alerts
0
Confirmed PPE events
Critical controls
2/7
Ready / register
Safety-head review readiness

Oil & gas / mega-project HSE critical controls

Positioned for reviewers from Aramco-style contractor HSE environments: PPE detection is one control, wrapped with permit/JSA, ISO 45001, Life-Saving Rules, Focus Four, privacy, escalation, and audit evidence expectations.

Open control register
3
Implemented
4
Designed
1
Client inputs
Aramco-style contractor HSE
Permit-to-work + JSA linkage

High-risk work must be authorized, tied to task-level JSA/JHA controls, and traceable to a competent receiver/approver.

designed
IOGP Life-Saving Rules
Life-Saving Rules critical controls

System must surface controls for work at height, lifting, confined space, energy isolation, hot work, driving, line of fire, bypassing safety controls, and work authorization.

designed
OSHA Construction Focus Four
Construction fatal-risk focus

Falls, struck-by, caught-in/between, and electrical hazards need visible risk controls, inspection evidence, and corrective action tracking.

designed
ISO 45001
OH&S management loop

Leadership commitment, worker participation, risk assessment, audit, incident/nonconformity handling, corrective action, and continual improvement must be visible.

implemented
Aramco-style contractor HSE
Contractor competency and onboarding

Contractor HSE plans, orientation, training/competency, role authorizations, and HSE staffing expectations should be tracked.

external input required
ISO 45001
Emergency preparedness and escalation

Critical events need escalation path, emergency contacts, drill/readiness records, and evidence of response effectiveness.

designed
SiteGuard AI
Privacy, redaction, and data residency

CCTV evidence must minimize personal data, protect raw feeds, preserve chain of custody, and respect data-residency constraints.

implemented
SiteGuard AI
AI detector integrity

Model status, confidence, false positives, human review, and no-fake-detection behavior must be explicit.

implemented

Portfolio operating risk

Review open observations and assign owners/due dates.

red

Operator next step

Start from a site, then manage cameras, zones, alerts, actions, evidence, and reports inside that site context. This mirrors how multi-site construction operations are actually run.

High-priority observations

Missing edge protection at Level 3 west slab
Riyadh Metro Package A · Level 3 · west slab

Open edge was found without complete barricade. Immediate control and corrective action required.

highopen

Latest daily report

Riyadh Metro Package A
2026-10-24 · day
42% progress · 126 workers

Concrete pour completed for Zone B; MEP rough-in started on Level 2.

Latest AI evidence

View all
demo-edge-protection.png
Unprotected edge indicated
Riyadh Metro Package A
highaccepted